A pile of trusses up, posts poured and back filled, and some more wall sheathing up. If you look closely you can see the mammoth rock in the path of the right side retaining wall that has been drilled out with rebar epoxied into it (same with the slightly-leaning sonotube pier on the rock). It’s […]