Closer to Code
The front staircase goes in. We won’t use this much until the retaining wall and pathway are done, but to get occupancy, this was one of the last things on the checklist.
The front staircase goes in. We won’t use this much until the retaining wall and pathway are done, but to get occupancy, this was one of the last things on the checklist.
I really like these baluster connections vs the alternative of drilling a million holes in the handrail and deck boards. Allows for taller rail heights with the same length balusters as well. Exterior balusters are 3/4″ round black painted aluminum.