On a solid foundation
The forms are stripped from the footings as the sun sets on another long day.
The forms are stripped from the footings as the sun sets on another long day.
Foundation hole is dug, including cut-outs for the front deck post footings.
Step footings are dug out. With a walkout basement you have to step down a max of 24″ at a time, with 4′ in between each step. Makes for some fun digging and forming!