Boulderdash
These two sisters were far too big for our little machine to move, so they became one with the footings by drilling and epoxying rebar into them.
These two sisters were far too big for our little machine to move, so they became one with the footings by drilling and epoxying rebar into them.
Chip’s always ready to help wherever he can.
Carson spreads crushed gravel deep in the step-footing trenches.
The forms are stripped from the footings as the sun sets on another long day.
Step footings are dug out. With a walkout basement you have to step down a max of 24″ at a time, with 4′ in between each step. Makes for some fun digging and forming!